Full closures on the B321: Large construction sites at Crivitz announced!

Full closures on the B321: Large construction sites at Crivitz announced!
Crivitz, Deutschland - From mid-June 2023, the B321 at Crivitz will be affected by comprehensive renovation work. These measures begin on June 16, 2023 with the renewal of the road cover on the bypass between Weinbergstrasse and Parchimer Straße. In order to be able to carry out the work, the route will be completely blocked by July 27, 2023. The those responsible for the road construction office ask the residents, commuters and traders for understanding and recommend using the signposted diversions.
After completing the first construction phase, a second follows, which begins on September 8, 2023 and is expected to last until October 5, 2023. This second phase concerns the construction work in the Zapel area, especially between Crivitz-Parchimer Straße and the branch to Ruthenbeck. These restrictions will also bring longer travel times here.
News from the construction site situation
In addition to the work on the B321, there are other construction sites in Mecklenburg-Western Pomerania, which are currently causing traffic disruptions. According to information from Strassen-mv.de , numerous lane institutions and renovations begin in various places in the country today, on June 12, 2025.
- Penkun - Pomeelle : 8.9 km long roadway repair.
- as Schwerin Ost - Rifa Wismar : Funding renewal from May 14 to July 7, 2025.
- long construction sites:
- Schönberg - Grevesmühlen : Several sections between 350 and 450 m will be renovated from today.
- Neubrandenburg-Ost-Strasburg (Uckermark) : 9.4 km long roadway repair from June 11th to December 5th 2025.
The construction work aims at long -term improvement in traffic safety. The residents and road users are therefore asked to take the schedule into account in their trips and use the diversions in order to make their own ways as pleasant as possible.
As everywhere in Mecklenburg-Western Pomerania, there are also various construction sites that overlap in the time frame. So if you drive, you should take a look at the current traffic information and adjust to longer travel times. All participants wish that the measures run as smoothly as they are planned.
Details | |
---|---|
Ort | Crivitz, Deutschland |
Quellen |